WorkCenterProjectPlan[1].pdf

(104 KB) Pobierz
Plytanium Project Plan: Work Center
Work Center Project Plan
The Georgia-Pacific work center is a welcomed
addition to your basement, garage or utility room.
It can be modified easily for several decorator
looks including a work bench or potting bench.
For an additional decorative look, substitute
Plytanium Ply-Bead ® panels for the work center
doors. The work center will be a piece of furniture
you can enjoy for years to come.
MATERIALS AND CUT LIST
Buy: 3—
¹⁄₄
x 4
x 8
Plytanium Sanded Project Panels
Cut : 2— 8
x 4
top shelves
inner shelves
2— Sides 22
x 4
wide x 31
¹⁄₂
high
1— Back 48
wide x 57
¹⁄₂
high
2— Doors 20
¹⁄₈
x 28
high
Buy: 1—
²³⁄₃₂
x 4
x 4
Plytanium Sanded Project Panels
Cut: 48
wide x 28
¹⁄₂
deep worktop
Buy: 10 — 2 x 4 x 8
studs
Cut : 10 — 48
shelf frame fronts and backs
4— 5
shelf frame sides
6 — 21
shelf frame sides
1— 12
blocking
1— 48
worktop stiffener
2— 60
rear legs
2— 34
front legs
Buy: 2—1x 2 x 8
boards
Cut : 4 — 28
tall door frames
4 —17
¹⁄₈
wide door frames
Buy: 2— cabinet knobs
Cut : 4 — cabinet hinges, 1
¹⁄₂
x 2
¹⁄₂
Buy: Wood glue, 8d and 16d nails, drywall screws,
magnetic catch for cabinet doors. Acrylic latex
primer and paint or opaque color stain.
2— 24
108198609.001.png 108198609.002.png
Work Center Project Plan
ASSEMBLY (NOTE: Glue all joints.)
1. Build 2 x 4 frames for each top and
inner shelf. Nail
¹⁄₄
³⁄₄
plywood flush to rear edge. Leave
overhang on front edge.
Side View
3. At height indicated on drawing, nail
front legs to 3 lower shelves, then nail
on rear legs. Check for square. Attach 2
upper shelves.
Shelf, Typical
Shelf Frame, Typical
Rear Leg, Beyond
Back
Worktop
4. Screw plywood sides and back in place
leaving 2
gap from floor.
Blocking
Worktop Stiffener
Hinge, Beyond
Cabinet Knob
Shelf Frame, Typical
Cabinet Door
5. Nail blocking to worktop frame centered
between front legs.
6. Nail worktop stiffener over blocking and
on top of front legs. Screw down
worktop to stiffener.
¹⁄₄
Plytanium Sanded Project Panel over 1
x 2 frames. Screw cabinet knobs
through doors at frames. Attach cabinet
doors to front legs using hinges.
Door Frame, Typical
Hinge, Beyond
Front Leg, Beyond
8. Sand all rough edges. Prime and paint
with primer and acrylic latex paint or
opaque color stain.
Top View, Upper Shelves
Back
Rear Leg, Typical
Shelf Frame
Top View, Cabinet
Back
Rear Leg, Typical
Shelf Frame, Typical
Side, Typical
Front Leg, Typical
Worktop Stiffener, Above
Worktop Overhang, Above
Georgia-Pacific Corporation
55 Park Place – Atlanta, GA 30303
1-800 BUILD GP
www.gpplytanium.com
Georgia-Pacific Corporation makes no warranties expressed or implied regarding these
plans and specifically disclaims the warranties of merchantability and fitness for a particular
purpose. Check with an architect or a building expert to make sure that these plans are
appropriate to your situation and meet local building codes.
PLYTANIUM is a trademark and PLY-BEAD is a registered trademark of Georgia-Pacific Corporation.
© 2003 Georgia-Pacific Corporation. All rights reserved. Printed in USA.
7/03 Lit. Item #011647
Plytanium Sanded
Project Panel flush to all edges.
2. Build 2 x 4 worktop frame. Nail
¹⁄₂
7. Build cabinet doors by screwing
108198609.003.png 108198609.004.png
Zgłoś jeśli naruszono regulamin