sts121payloadassembly.pdf

(421 KB) Pobierz
Revised
© 2008
Assembly Instructions for STS-121
payload
(Discovery’s Return to Flight-1)
793829253.017.png 793829253.018.png
Building “Leonardo” Multipurpose Logistic Module
Front
Aft
Make a cylinder as photo shows and glue both conical parts on both ends.
Attached the Docking system
See photos for reference when building this module.
793829253.019.png 793829253.020.png 793829253.001.png 793829253.002.png 793829253.003.png 793829253.004.png 793829253.005.png 793829253.006.png
Note that the circular white
patches are not present for
this mission. These Visual
Targets first appeared during
the
first
missions
for
Leonardo and Raffaello.
(STS-102, STS-100, STS-
105, STS-108, and STS-111)
Building the Integrated Cargo Carrier
First build the main part of this platform as photo shows. This photo shows the prototype.
793829253.007.png 793829253.008.png
Glue the upper portion of
the platform on top of the
main part as photo shows.
Then the bottom portion
is glued.
These are the main
elements that will be
glued on top of the
platform. Match the
numbers.
793829253.009.png 793829253.010.png 793829253.011.png
Photo shows the TUS-RA
(Trailing Umbilical
System-Reel Assembly.
Arrows indicate the
sequence how these parts
are glued one on top of
each other.
The whole TUS-RA
object is then placed on
top of the small opened
cradle in a diagonal
position.
Pump Module
See photos below for reference.
793829253.012.png 793829253.013.png 793829253.014.png 793829253.015.png 793829253.016.png
Zgłoś jeśli naruszono regulamin