· Inspect for signs of overheating
· Presence of phase barriers and shrouds
· Presence of labels
· Check connections for tightness
· Is access to switchgear impeded
· Are the duties of the circuits marked up
· Verify the neutral connections are in the same order as the phase conductors
· Check operation of switches
· Check operation of rcd units on test button
· Check for damage or holes in casing
· Are necessary warning labels in position
· Carry out insulation testing
· Verify the number of cables enclosed does not exceed the spacing factor
· Verify the segregation of cables contained in the trunking is correct.
· Verify the earth continuity of the trunking
· Verify the presence of phase barriers
· Check for damage and holes
· Check trunking is correctly supported
· Check for missing lid
· Check for incorrect jointing of cabled within trunking
· Check for damage
· Check the condition of the central battery unit
· Verify the emergency lighting is connected to the correct circuits zones
· Check for presence of test switches
· Check for presence of testing record sheets
· Check for damaged fittings
Sub Main Cables
· Verify the cables are correctly supported
· Check for damage to cables
· Check for incorrect terminations
Extension Leads And Portable Appliances
· Check for presence of testing labels
· Carry out testing if applicable
Site Documentation
· Check for presence of main switchgear location plan
· Check for presence of schematic plan